As part of a pre-construction assessment in Bridgeport, CT, CorBuilt was contracted to support geotechnical soil boring operations with advanced utility locating services. Before drilling could begin, our team needed to ensure the area was free of underground...
As part of a site assessment in Waterbury, CT, HRP partnered with CorBuilt to perform a utility investigation ahead of scheduled soil boring work. Before drilling could begin, it was critical to confirm that all bore locations were clear of underground utilities....
Ahead of geotechnical drilling operations in Bristol, CT, OTO partnered with CorBuilt to ensure safe soil boring by clearing each bore location of underground utilities. Using Ground Penetrating Radar (GPR) and Electro Magnetic Induction (EMI), our technicians scanned...
On February 20, 2025, CorBuilt completed a full utility mark out at Eastern Connecticut State University (ECSU) in support of upcoming site work led by SAVY. The objective was to locate all underground utilities across a designated area of campus to ensure safe and...