In March 2025, Veolia engaged CorBuilt to perform a comprehensive utility mark-out and GPS mapping at their Trumbull Street site in New London, CT. The objective was to identify and document all underground utilities to ensure safe excavation and infrastructure...
CorBuilt was brought in to perform a targeted sanitary line investigation for a municipal site in New London, CT. The objective was to trace active and abandoned sanitary sewer lines to support infrastructure planning and avoid conflicts during future upgrades. Our...
Following saw cutting operations at Windham High School, Noble Construction engaged CorBuilt to perform a post-cut subsurface scan. The objective was to verify that no in-slab utilities or structural elements were compromised and to document remaining conditions...
As part of a site evaluation at UConn Health in Farmington, CT, OCC contracted CorBuilt to perform a specialized Underground Storage Tank (UST) investigation. The objective was to confirm the location and orientation of a suspected tank and identify any related...